
Under Construction 2.0:
In the progression of work for Tasmeem 2024, I further refined the design of the "Under Construction" barriers by incorporating the logo of Tasmeem 2024 directly onto the concrete barrier. Additionally, I added details such as pre-drilled holes for wires, eliminating the need for post-production drilling and minimizing the overall production process.





